> It takes about 3 years to build a DataCenter. That definitely depends on where and which kind of data center. If you're willing to take a derelict warehouse
by mschuster91 9y ago
> It takes about 3 years to build a DataCenter.
That definitely depends on where and which kind of data center. If you're willing to take a derelict warehouse and put in containers like Google did, all you need to do is providing power and fiber (which should be plenty in any industrial settings) and you're set in a matter of weeks to months.
If you're aiming higher, as in design a DC, buy the ground, build the building itself and then installing all the stuff needed, you're in for much more money and time. Depending on the local politics and laws as well as power/fiber infrastructure, you can cut some corners but the worst-case (uncooperating politicians that need to be brought in line by the courts, the next 110kV transformer being at capacity, no fiber and no empty tubes in the ground which means digging yourself) is the benchmark there.
- Caveman_Coder 9y ago> "...the next 110kV transformer being at capacity" They will mostly likely work with the local utility to build an entire substation for the DC, so they won't have to deal with sharing capacity on an existing sub's XFMR.
- agoodthrowaway 9y agoYep these facilities require >100MW and require their own substations. Hence one reason why it takes so long to build.
- Caveman_Coder 9y agoI'd imagine that the lead time on getting the substation equipment is probably the longest for all of equipment inside a DC. Chillers, UPSs, generators, and breakers are probably not in as high demand or take as long to manufacture as a MV XFMR.
- sah2ed 9y agoWhy not shorten the lead time by biding higher for freshly built XFMRs from other countries of the desired capacity?
- agoodthrowaway 9y agoGoogle has many large facilities that are definitely not shipping containers. You can do this for caching sites but it doesn't really work all that well from a cooling efficiency POV. In 2009 when they were building shipping containers their PUE was as high as 1.22 which is essentially not that much better than traditional raised floor and air conditioners. Their modern DCS are not built like this. Instead they have hot aisle and cold aisles. They call their cold aisles hot huts. So you essentially trade off time to market for PUE. In a large compute region the higher PUE of the shipping container approach is going to limit how many servers you can put in that location because power to a particular site is often a limiting factor. Also not everywhere do you have access to water from the Columbia river.