4 ms·
Automobile final assembly lines produce about one car per minute. About 2400 per week for one shift. Some are slightly slower or faster, but not by a lot. It's
by Animats 9y ago
Automobile final assembly lines produce about one car per minute. About 2400 per week for one shift. Some are slightly slower or faster, but not by a lot.
It's common to run two production shifts, but not three; one shift is needed for line maintenance. 1,000 per week indicates the production line is running, but having problems. This is much better than the few hundred per week from December, which meant hand assembly.
One line should top out at 2 shifts, about 5000 vehicles per day, or about 100,000 per year. Then add a second production line.
If you really want to find out what's going on in Tesla's plant, find a United Auto Workers organizer in a bar in Fremont and buy him a few beers.
- reificator 9y agoIf you ever want to get a feel for designing a plant that produces a car every minute, I highly suggest taking a look at Factorio. It's a little abstracted and a little gamey, but the core feel is there, and I very much enjoy the logistics of it. https://www.factorio.com https://www.factorio.com
- tehsauce 9y agoFactorio is probably the most satisfying game I've ever played. Amazingly challenging but has a wonderful feeling of accomplishment when building things. Don't mind the graphics, it's a lot of fun :)
- froindt 9y agoI'm an industrial engineer who also plays factorio. It does a really good job of teaching some of the core parts of running a factory. * what happens when there are supply chain hiccups? * how much inventory do I want? Converting too much iron to steel will waste resources. What is the right mix? * where is my bottleneck? Making anything else faster doesn't matter for overall production. * every process has different time, space, and energy requirements. Running off of entirely electricity or fossil fuels both have pros and cons. I've thought a bit about how it could be used to teach students in the classroom. It would be nice to have UI counters on the machines and setup a small factory. The concept of quality would also be a cool extension. It's also just fun to look at the resources required to build a product from raw source. In real life the concept still applies - 10 lbs of ore will be a fraction of that once refined and a small fraction of that once formed and milled into a desk widget.
- wcarss 9y agoI'm really not grokking your math. You said 1 car/minute/line, which on an 8 hour, 5 day shift would yield 2400 cars per week, and then 4800 from two shifts. Then you said 5000/day, and I think you meant week, which lines up with the previous numbers, but then: how is that 100,000/year? ~5000*~50 is ~250,000/year. Do plants only run for 20 weeks/year? Also, why only run a plant 5 days/week? It seems (admittedly, entirely naively of any industry knowledge here, like union rules) like each line should be capable of close to 350k/year at 1/minute for 16 hours a day.
- Animats 9y agoYes, my annual numbers are off. 5000/week is about right for two shifts, or 250,000/year.