2 ms·
There is also a tradition to have architect and engineer of the new bridge to float in the boat under it while the bridge is being load-tested.
by rimliu 9y ago
There is also a tradition to have architect and engineer of the new bridge to float in the boat under it while the bridge is being load-tested.