Inside Vancouver's Brock Commons, World's Tallest Mass Timber Building (2017)
- kreetx 9y agoNot to say this building isn't great, but are those two internal towers in the third image made of concrete there? Is that so to make the elevator shafts (fire resistant)?
- Amygaz 9y agoYes that's the code. They have to use a reinforced concrete structure that is earthquake resistant. It houses the elevators, the stair cases, and utilities. It's pretty standard everywhere for tall building.
- sandworm101 9y agoElevators are also long moving mechanical systems that need extreem reliability to be useful. There is still a place for the stability and rigidity of metal in such systems.
- infoaddicted 9y agoThere's another site I won't visit again. (modal popup to subscribe before I can even see the page)
- sizzzzlerz 9y agoSo when the building was complete, what were the final costs relative to an equivalent steel and concrete structure? The video said construction took 9-1/2 weeks but there was a lot of pre-planning, mock ups, etc. that wouldn't have necessarily been needed for the steel version. Those extra costs need to be factored in as well, at least until enough experience has been gathered to no longer require it.
- kazinator 9y agoIt was finished in 2016, after eight months. According to this article: https://biv.com/article/2016/09/crews-complete-structure-record-setting-timber-tow https://biv.com/article/2016/09/crews-complete-structure-rec... "The $51.5 million structure is on budget, and Metras expects any future buildings to cost less, as the Brock Commons budget also includes $4.45 million from external agencies to cover first-time costs of using mass timber on such a scale."
- kazinator 9y agoMuch better link: http://vancouver.housing.ubc.ca/residences/brock-commons/ http://vancouver.housing.ubc.ca/residences/brock-commons/
- acidus 9y agoT3 in Minneapolis feels much nicer! https://www.archdaily.com/802831/t3-michael-green-architecture https://www.archdaily.com/802831/t3-michael-green-architectu...
- kazinator 9y agoShort. Looks like an office building, not residential: no balconies. (Do the windows even open? Good luck trying to feel good when HVAC is down.) No ocean/mountain views.
- dis-sys 9y agoit is pretty misleading to call it a timber building, there are clearly two concrete and steel cores there.
- allannienhuis 9y agoThat was quite interesting, particularly the videos. Lots of use of pretty innovative techniques - 3d modelling, just in time delivery during construction, CNC for structural members & pre-fab parts (high precision for construction industry)
- malkia 9y agoHow is this building protected against termites and other wood eating pests?
- caresource_ta 9y agoI can't provide a specific answer but the whole field of Engineered Lumber works on these problems.
- cloudwizard 9y agoThe speed of construction is due to prefab wood. Prefab concrete would be just as fast or faster. https://www.youtube.com/watch?v=rwvmru5JmXk https://www.youtube.com/watch?v=rwvmru5JmXk It has nothing to do with wood. Wood could be easier on the environment though.
- caresource_ta 9y agoPrefabrication requires a higher level of design maturity as opposed to traditional construction and from my anecdotal experience this can provide a significant increase in speed itself. I did a quick search to determine if cities built from wooden structures can act as carbon sinks and I came across this great overview of the carbon footprint of wood buildings[0]. Granted it was created by a special interest group. 0- PDF http://www.awc.org/pdf/education/gb/ReThinkMag-GB500A-EvaluatingCarbonFootprint-1511.pdf http://www.awc.org/pdf/education/gb/ReThinkMag-GB500A-Evalua...