3 ms·
One last reference, these are in contrast to peaker power plants [3] which can quickly start up and shut down as needed to cover high demand periods. Gas, hydro
by wlesieutre 9y ago
One last reference, these are in contrast to peaker power plants [3] which can quickly start up and shut down as needed to cover high demand periods. Gas, hydro, and grid tied batteries fit into this category.
At least in the US, the grid runs as a market where as demand rises, plants bid their price to meet the demand. The energy price that they charge for these peaks is substantially higher than the base load price because you have to build enough power plants to meet the highest demand (else you get brownouts) and the peaker plants are only going to run for a small fraction of the time. The price they charge for that small time still has to cover all of the infrastructure cost.
Since the peak energy price is so high, that makes a good opportunity for batteries to jump in. Tesla's recent Australian battery project is a great showcase of that.
[3] https://en.wikipedia.org/wiki/Peaking_power_plant https://en.wikipedia.org/wiki/Peaking_power_plant