Nuclear Commission Approves a Safety Aspect of NuScale Power’s Advanced Reactor
- jdonaldson 9y agoNuclear power buffs should be pleased. This is the first positive step forward for nuclear power for as long as I can remember. 50MW of power is powering roughly 50K homes for a year. It'll probably be for industrial usage at first, but either way it will take pressure off the power grid, and probably make the grid more resilient to boot. It's difficult to imagine a catastrophic failure scenario for these since they don't require mechanical pumps. But, I'm guessing there's some industry folks here that have more of a nuanced read on this. (edit: yay Oregon!)
- jacquesm 9y ago> 50MW of power is powering roughly 50K homes for a year. 50MW is instantaneous power, not power drawn over a period of time.
- jdonaldson 9y agoOk, I'm off a bit. It looks like 25K homes according to this : https://en.wikipedia.org/wiki/Domestic_energy_consumption https://en.wikipedia.org/wiki/Domestic_energy_consumption
- philipkglass 9y agoYou were close enough the first time. For US households, annualized, 1 kilowatt of electrical demand is about right. The rest of it is fuel-based heating (natural gas stoves/furnaces/water heaters, some oil/wood/coal based heaters.) https://www.eia.gov/tools/faqs/faq.php?id=97&t=3 https://www.eia.gov/tools/faqs/faq.php?id=97&t=3 10766 kWh per year is ~1.2 kW continuous.
- fmihaila 9y ago> 50MW of power is powering roughly 50K homes for a year. This may seem pedantic, but the relevant measure is power when speaking of generators, like this reactor, and energy (in addition to power) when talking about storage, like say, the Tesla battery in Australia. So "...powering roughly 50K homes for a year" could just as well be for a second, a week, or a decade. Indicating a time interval is not meaningful in this context. Power is the rate of energy consumption/generation (think water flow rate at the faucet), while energy is the total amount stored or consumed (how much you have in the bathtub). Mixing up power (W) with energy (Wh) is unfortunately a pervasive mistake in the media, too; we should strive to avoid it, lest we contribute to the confusion. (Also, 1kW per house is probably too little; somewhere around 3kW is probably closer to reality.)
- maxerickson 9y agoAverage draw in the US is ~1200 watts. https://www.eia.gov/tools/faqs/faq.php?id=97&t=3 https://www.eia.gov/tools/faqs/faq.php?id=97&t=3 Canada is similar and then most other places are ½ or less.
- fmihaila 9y ago> Average draw in the US is ~1200 watts. Peak draw is more relevant, though, than average draw. My point was that in a hypothetical town with a single 50MW generator you cannot sustain 50k households, due to daily peak usage exceeding the average by a significant factor. Edit: on reading your reply, you're right.
- maxerickson 9y agoI think for nuclear the average draw probably is at least equally relevant. Reducing output costs money, so it isn't really going to follow the load down.
- Reason077 9y agoAs energy storage becomes more prevalent in the coming years, peak load becomes less relavent. Once you add storage, you really can supply 50k households (consuming an average 24kWh per day) from a 50MW supply.
- CryoLogic 9y ago50MW per reactor at 12 per plant is 600MW. Or 600k homes powered by a single power plant. Nuclear is now very safe, and cleaner than coal. I am glad this project is moving forwards. EDIT: Opportunities for more skilled jobs is always a plus too.
- acidburnNSA 9y ago> cleaner than coal It's also cleaner and less carbon intensive (12 gCO2/kWh) than pretty much everything else out there. Wind beats it as the least carbon intensive (11 gCO2/kWh). Original reference: https://www.ipcc.ch/pdf/assessment-report/ar5/wg3/ipcc_wg3_ar5_annex-iii.pdf https://www.ipcc.ch/pdf/assessment-report/ar5/wg3/ipcc_wg3_a... Writeup with plots: https://partofthething.com/thoughts/a-medium-length-primer-on-energy-greenhouse-gas-intermittency-and-nuclear/ https://partofthething.com/thoughts/a-medium-length-primer-o...
- Angostura 9y agoHow is the long-term waste handled?
- devhead 9y agotransferred across our roads, rails, rivers and then returned to earth with a sign that says stay out forever. These are not points to ignore when talking about the benefits of using this process. I haven't read the reports, hopefully the accounted for that extra co2 from disposal processes, clean up and recovery.
- rwcarlsen 9y agoModern transport and disposal techniques are much safer than the transport and disposal of many other industrial chemicals/waste both due to the nature of the waste as well as precautions taken. And disposal cost and carbon footprint are absolutely accounted for in all studies/reports worth their salt. I'd be totally fine having the spent fuel buried in my backyard (in typical/standard disposal canisters) and drinking well-water pumped from below. I am a nuclear engineer FWIW.
- Animats 9y agoNot bad. I do worry about the containment vessel not being much bigger than the reactor. That was part of the problem at Fukishima. When the reactor overheated and turned the cooling water to steam, the pressures were too high and the containment was breached. Three Mile Island had a big containment vessel, and when they had a partial meltdown, the containment held.
- trhway 9y agoseems like they suggest to put it into a water pool in the ground inside the reactor building. http://www.nuscalepower.com/images/nuscale_smr_benefits/Right_Column/nuscale-safe-reactor-barriers.jpg http://www.nuscalepower.com/images/nuscale_smr_benefits/Righ...
- baobrien 9y agoI think the whole idea with NuScale reactors is that if you take away external power and scram the reactor, there's enough water in the pool to handle the decay heat. After the water boils away, the decay heat is supposed to be small enough that passive air cooling will keep it safe.
- wbl 9y agoThe containment pressures in a NuScale reactor are supposedly lower according to slides I found on the IAEA website. The containment is initially vacuum and apparently the initial pressure pulse of a pressure vessel failure will be contained and the steam will rapidly equilibriate.
- gene-h 9y agoThe headline is misleading, they haven't approved the design yet. However, they've been able to certify that the reactor does not need a certain standard of backup power supply and electrical circuitry due to the passive safety features of the design. This standard essentially requires that nuclear power plants have a connection to the grid and an on site backup generator to safety systems that are on completely separate circuits from the nuclear power plant electrical generation systems. Not having to do this makes it cheaper for NuScale to deploy powerplants. And it also makes it easier for them to build powerplants in remote places where a connection to the electrical grid is not available[0]. [0]https://www.nrc.gov/docs/ML1616/ML16169A148.pdf https://www.nrc.gov/docs/ML1616/ML16169A148.pdf
- dang 9y agoThanks, we've revised the headline to use less misleading language from the article. Edit: submitted title was "U.S. Nuclear Regulatory Commission Approves NuScale Power’s Advanced Reactor".
- Klathmon 9y agoWhen you do this would it be possible to include the old headline in your comment? Without it comments like the GP are harder to understand what exactly they are speaking to.
- devdj 9y agoIs there any indication of how long it would operate before needing refuelling or decommissioning?
- Zaak 9y agoAccording to http://www.nuscalepower.com/our-technology/technology-overview http://www.nuscalepower.com/our-technology/technology-overvi... it would have a refueling cycle of 24 months. I didn't see anything about the expected lifetime of their reactors.
- twotwotwo 9y agoThere's a lot more about the design from the company in https://www.iaea.org/NuclearPower/Downloadable/Meetings/2013/2013-09-02-09-04-TM-NPTD/20_usa_colbert_nuscale.pdf https://www.iaea.org/NuclearPower/Downloadable/Meetings/2013...
- humanfromearth 9y agoHow much does it cost? Who can buy them?
- dmichulke 9y agoFrom wikipedia: The company estimates a twelve-unit NuScale plant would cost $5,000 per kilowatt. In comparison, the Energy Information Administration in 2011 estimated costs to be $4,700 per kilowatt for conventional nuclear power, $4,600 for a carbon sequestration coal plant and $931 at a gas-fired plant or in excess of $1,800 for a gas-fired plant with carbon sequestration. 12 unit = 600kW => 3bn$ https://en.wikipedia.org/wiki/NuScale_Power https://en.wikipedia.org/wiki/NuScale_Power Re "Who can buy them?" - if you have the 3bn, you will probably be able to afford whatever license you need to buy that thing.