3 ms·
For 3), there was recently an article, that highest cost in US rail projects is buying land. 3 kinda offsets this.
by lostmsu 9y ago
For 3), there was recently an article, that highest cost in US rail projects is buying land. 3 kinda offsets this.
- Jesus_Jones 9y agoBuilding rail on a non-fixed "floating bridge" is probably expensive too :-)
- djsumdog 9y agoIt will be the first floating bridge rail in the world. They've already built the test track, so so hopefully they have an accurate idea of how much the production segments will cost: https://vimeo.com/163631993 https://vimeo.com/163631993