2 ms·
The people runming self-imposed scheduals are the ones that get things done. They dont need the same level of supervision. They are the ones to trust with ope
by sandworm101 9y ago
The people runming self-imposed scheduals are the ones that get things done. They dont need the same level of supervision. They are the ones to trust with open-ended or unknowable tasks.