2 ms·
By trolley bus do you mean what are also called “trackless trolleys” — busses with tires but no fuel storage that get power from an overhead line? I’ve presume
by gumby 9y ago
By trolley bus do you mean what are also called “trackless trolleys” — busses with tires but no fuel storage that get power from an overhead line?
I’ve presumed that the infrastructure buildout and lack of flexibility make the TCO generally not worth it. In addition, if you need a mix you may get an economy of scale on one set of gear (maintenance, parts, flexibility etc — like a single-model-of-aircraft airline).
But this is speculation on my part
- angled 9y agoTwo other reasons may be aesthetics, and the environment - Beijing gets sandstorms but it doesn't get typhoons. Per CLP (just across the border in Hong Kong): > More than 30% of CLP’s transmission network consists of overhead lines. There are more than 700 400kV transmission towers that form the backbone of its supply system. Overhead lines are exposed and susceptible to the influence of weather and the external environment. If a pylon is destroyed by strong winds or collapses because of a landslip, it will take several months to be back in order. https://www.clp.com.hk/en/about-clp-site/corporate-information-site/scheme-of-control-site/Documents/4.1%20CLP%20Information%20Kit.pdf https://www.clp.com.hk/en/about-clp-site/corporate-informati...