3 ms·
A heated gutter around the perimeter with heated drainage duct would be needed for egress. If they just heat the perimeter and let water drip off the roof, it'l
by cmurf 9y ago
A heated gutter around the perimeter with heated drainage duct would be needed for egress. If they just heat the perimeter and let water drip off the roof, it'll immediately form ice piles below.
At first it seems like a design flaw, but then how did the city zoning and building permit process not catch it? Maybe they don't care or there is no ordinance and therefore Apple's architect and builder doesn't care either. It may be entirely intentional and by design.