4 ms·
Incrementally redoing the signal system is difficult, particularly because the system has lots of branches and reverse branches--which means you have to basical
by jcranmer 9y ago
Incrementally redoing the signal system is difficult, particularly because the system has lots of branches and reverse branches--which means you have to basically have it enableable on the entire system before you can enable it, rather than doing lines at a time.
- nine_k 9y agoDifficult, of course. But not impossible, and not specifically because trains cannot be stopped for doing work. Most of the tunnels have 4 lines, so half the line can be worked on while the line still operates; this is being done all the time.
- betterunix2 9y agoExcept that the MTA is doing it on sections of lines at a time. It is actually not hard, because the equipment does not have to be aware of things beyond whatever sections of track it controls (otherwise, any upgrade would require national coordination, since most rail systems, including the NYC subway, are connected to the national rail network).