4 ms·
I don't know, but presumably there's still a lot of work - planning and then (re)locating points/switches - planning and then (re)locating signals or balises
by Symbiote 9y ago
I don't know, but presumably there's still a lot of work
- planning and then (re)locating points/switches
- planning and then (re)locating signals or balises
- updating trains
- configuring the software to reflect the track and signals
- verifying the final configuration