In a single integration test? That'd be pretty absurd. At least in our project, each integration test has a certain amount of overhead. Some backends are fakes
by Xorlev 9y ago
In a single integration test? That'd be pretty absurd.
At least in our project, each integration test has a certain amount of overhead. Some backends are fakes (when I request X, you provide Y), some are actually booted up with the test, e.g. persistence.
Multiply this across N integration tests, have lots of demand for the same CPUs, and you're up to 30-40 minutes of integration test time.
Though, that said, some integration tests can be crazy long if they have a lot of "waitFor" style conditions. "Do this, then wait for something to happen in backend Z. Once that's done, do this, and this, and this..."
- Buge 9y ago>Multiply this across N integration tests, But in theory with enough servers all the integration tests could be run in parallel. So it would only take as long as the longest single test.
- byroot 9y agoThe longest single test + the time it takes to setup the test environment (booting servers, etc). Parallelizing tests has diminishing returns unless you manage to dramatically reduce the setup time.