Here’s some napkin math based on a few assumptions. Assumptions: The article is correct and it’s an 800KW battery pack for the semi. I’m also going to go with
by jsjohnst 9y ago
Here’s some napkin math based on a few assumptions.
Assumptions:
The article is correct and it’s an 800KW battery pack for the semi. I’m also going to go with a conservative assumption and assume 2C charging rate for the battery pack. I’m also going to assume that the semi will have the ability to take in a 480V charging current because it simplifies wiring and is easier to get in an industrial capacity.
With those assumptions, you’ll need 1.6MW of power, something that can be easily delivered with less than eight 500MCM cables (roughly 1” copper cables including insulation that weigh about 2lb a foot and are still rather flexible). This seems in line with the charging port photos I’ve seen for the semi. Neither the cables or the power needs are that dramatic, there’s wind turbines that put out that much power individually along I-70 in Kansas for example where there is thousands of them.