3 ms·
> It also means that on the distribution grid, a charging station for 8 semis will need a dedicated 20 MVA 33/11 kV distribution transformer, plus 4 11kV/480V t
by JoshTriplett 9y ago
> It also means that on the distribution grid, a charging station for 8 semis will need a dedicated 20 MVA 33/11 kV distribution transformer, plus 4 11kV/480V transformers.
Or a pile of batteries.
- raverbashing 9y agoSure, and how you're supposed to charge them fast enough to charge incoming trucks > a charging station for 8 semis will need a dedicated 20 MVA 20MVA is approx. 20MW, Solar Power is 100W/m2 hence that gives 0.2km2 (or 200,000m2 of needed area for 20MW) Solar won't help you in this case
- mtgx 9y agoNot locally, at least. Utility-wise, it will work out.