3 ms·
The feedback loops were too long. Real-world waterfall always contained the idea of feedback from later steps changing the results of earlier steps. (Not havi
by AnimalMuppet 9y ago
The feedback loops were too long.
Real-world waterfall always contained the idea of feedback from later steps changing the results of earlier steps. (Not having this means you have to be essentially perfect in your earlier steps to avoid having garbage input to your later steps. That can't be done. What's more, circumstances change during the life of the project, and if you don't respond to that, you're programming for the world as it existed six months or two years ago, and that is a recipe for failure.) This feedback to earlier layers was considered entropy, and the task was to manage it, to keep it from running out of control. The result was that you could be implementing something a year after the requirements were done, and six months after the design was done, and if you saw any problems, you were supposed to not revise the design (still less the requirements) unless you really had to.
In contrast, agile wants to have those times as short as possible, and to feed what you discover during implementation back into the design (and even requirements), in order to get them to better conform to reality.
Real agile is all about keeping the feedback loops tight. Waterfall was all about wholly completing phases, in order. This lead to waterfall being rather unresponsive to new information or external changes. (To see how demoralizing this can be, imagine working to implement something, where for the last three months you know it's the wrong thing.)