3 ms·
I think specific activities, irrespective of industry, should have their external costs priced in. I don't think that failure to do so the same thing as a cash
by SilasX 9y ago
I think specific activities, irrespective of industry, should have their external costs priced in.
I don't think that failure to do so the same thing as a cash subsidy.
- lostlogin 9y agoSo stick approach rather than a carrot? If that’s what you mean I think I prefer this.