3 ms·
Hah. That’s a good example. Even that’s overkill. Even if someone sheathed their exterior walls in plywood, structural sheathing runs 5/16 - 1/2”, and seams ar
by arkades 9y ago
Hah. That’s a good example.
Even that’s overkill. Even if someone sheathed their exterior walls in plywood, structural sheathing runs 5/16 - 1/2”, and seams are between studs. It’s for resisting shear stresses on the house and/or insulation. In terms of orthogonal force, it’s a far cry from requiring a saw to get in.