3 ms·
Mostly construction and commissioning for industrial/mine site 11kV distribution through to MV/LV motors; and a stint in asset management at a 400MW generation
by ben-coman 9y ago
Mostly construction and commissioning for industrial/mine site 11kV distribution through to MV/LV motors; and a stint in asset management at a 400MW generation plant. Haven't touched transmission.
- throwaway7645 9y agoSo you're probably the focus subgroup for the Power PE test haha. It seemed very focused on that area.