4 ms·
In an era when corporations are constantly accused of short term thinking, the 747 was a bet-the-company deal for Boeing. There was no government financing nor
by WalterBright 9y ago
In an era when corporations are constantly accused of short term thinking, the 747 was a bet-the-company deal for Boeing. There was no government financing nor subsidy. It was in service for 10 years before it began to show a profit for Boeing.
And then, boy did it ever show a profit. And not just for the Boeing, but for the airlines who loved its ability to make money.
The 747 was a triumph any way you want to look at it - free market, safety, engineering, money making, pleased customers, etc.
- function_seven 9y agoMy father worked for Boeing during (or shortly after) the time the 747 was designed. It was all done with pencil and paper. Thousands of draftsmen drawing every little component. I can't imagine the scale of such a process. My favorite bit about that. If you were take all the drawings produced during the design phase, and put them on a 747, it would't get off the ground. Not sure if apocryphal or not, but I buy it. EDIT: I see in another comment you worked there as well. Maybe you can verify the "heavy documents" anecdote :)
- WalterBright 9y agoThere was a joke that the design was not done until the weight of the paperwork exceeded the weight of the airplane, but I doubt anyone added it all up. The 757 was the last Boeing airliner to be designed on paper. They were experimenting with CAD software at the time, but it was pretty primitive. Slide rules were long gone. Engineers used calculators, and I snuck into the computer room and used Fortran for my work that had traditionally been done graphically with drafting equipment (I had no idea how that worked).
- Gibbon1 9y agoMy dad[1] worked on I think can't find the right term, but the fixtures that hold satellites while they're carried into space. Back in the late 60's they were using numerical analysis to design the things. But have a gut feeling before 1980-1985 likely wasn't anything that could hold, retrieve and display, edit all the cad drawings for something as complex as a 757. Bonus I remember retraining our draftsman to use CAD back in the late 80's, twuz painful. [1] Bonus my dad is as old as the DC3.
- WalterBright 9y agoComputer numerical analysis was used in some areas. But not with anything I was involved in (other than the programs I wrote myself), and it was not connected with CAD software. Bonus: my dad flew DC-3's :-) He had nothing but good things to say about them.
- _Codemonkeyism 9y ago"There was no government financing nor subsidy." I assume that the military part of Boeing, which was heavily subsidized by the government, paid for the tech development in the CX–HLS program - which resulted in the C5 - and from which many technologies were taken into the 747 program. The 747 has the raised cockpit because of the CX-HLS being a front loading transport airplane, it wasn't designed because of a first class lounge - in fact in the beginning no one had a clue what do with it. http://www.boeingimages.com/archive/CX-HLS-Transport-Study-2F3XC5KU5ID.html http://www.boeingimages.com/archive/CX-HLS-Transport-Study-2...
- WalterBright 9y agoThe C5 was a Lockheed project. The CX-HLS was just a design study. (A design study is several years from a prototype airplane.) As 747 Chief Engineer Sutter put it: "I should add that fostering large high-bypass engines was all that the USAF C-5 competition contributed to the Boeing 747, as my new airplane would be called. Time and again there appears in print the logical but false assumption that Boeing took its losing military C-5 bid and revamped it as the commercial 747. In fact, the 747 would be an entirely original design that owes nothing to the C-5." http://www.seattlepi.com/business/article/Aerospace-Notebook-Man-behind-the-747-tells-his-1193757.php http://www.seattlepi.com/business/article/Aerospace-Notebook...
- _Codemonkeyism 9y ago"The C5 was a Lockheed project." Yes, I didn't say something different, "[...] CX–HLS program - which resulted in the C5 - [...]" "In fact, the 747 would be an entirely original design that owes nothing to the C-5." I sadly have not time to dig deeper, but this looks suspicious, b/c the planes look highly similar and both were planned as freighters by the same company at the same time. And although he is a primary source, if you ask me about some of my projects from 20y ago, I'm hard pressed to recall all details. Also considering the legal lawsuits between Boeing and Airbus in any case this is a wise thing to say. But perhaps if I have more time next holidays. Thanks for the link.
- 9y ago
- lmm 9y agoThe company was being heavily government-subsidised at the time, both in their cancelled supersonic project and from the military side as other replies mentioned.
- WalterBright 9y agoThe Boeing 2707 SST had nothing in common with the 747. You'd be hard pressed to find any common parts or design elements. Supersonic airplanes are very, very different from subsonic ones. Look at the picture. There's no resemblance. https://news.ycombinator.com/edit?id=15481905 https://news.ycombinator.com/edit?id=15481905
- lmm 9y agoThat's not what I said. The company was being heavily subsidised, and money is fungible.
- WalterBright 9y agoThe government paid Boeing to do certain projects. That isn't a subsidy. Just like when you buy an F-150, you are not subsidizing Ford. Even if Boeing plows profits from government work into another project, that is not a subsidy. Profits are the property of Boeing, to use as they saw fit. (Boeing was making huge profits off of the 707 at the time.) https://www.merriam-webster.com/dictionary/subsidy https://www.merriam-webster.com/dictionary/subsidy The government did not provide payments or financial assistance to Boeing to design or build the 747. They did for the SST, but that was for the SST. Now, if Boeing diverted government money from the SST project to the 747, that would be fraud and a crime, and you'd need some evidence to assert that.