4 ms·
The method of interest here is loading data into BigQuery: https://cloud.google.com/bigquery/docs/loading-data https://cloud.google.com/bigquery/docs/loading-d
by slap_shot 9y ago
The method of interest here is loading data into BigQuery:
https://cloud.google.com/bigquery/docs/loading-data https://cloud.google.com/bigquery/docs/loading-data
Which has a limit of 50,000 loads per project, per day.
edit: corrected limit.
- vgt 9y agoIt's actually per table: https://cloud.google.com/bigquery/quotas#import https://cloud.google.com/bigquery/quotas#import
- slap_shot 9y agoDaily limit: 1,000 load jobs per table per day (including failures), 50,000 load jobs per project per day (including failures) https://cloud.google.com/bigquery/quotas#import https://cloud.google.com/bigquery/quotas#import
- vgt 9y agoI think the messages are crossing paths here. Your initial concern of 1000 loads per project is actually 50000 and can be raised. The limit of 1000 loads per TABLE per day is there, can't be raised, and a couple posts above explain how to work with this limit. This limit is also higher for partitioned tables. Apologies for brevity.