2 ms·
Power in a lot of places is 2-3x that, and for a naively designed data centre you can double that to include the cost for air conditioning (yes you can do a lot
by lathiat 9y ago
Power in a lot of places is 2-3x that, and for a naively designed data centre you can double that to include the cost for air conditioning (yes you can do a lot better but on a small scale, basic AC is going to equal your workload draw).
- 0xbear 9y agoData centers aren’t built in such places. And for just a few machines a simple building HVAC will do fine.