4 ms·
I agree that it shouldn't be the sole data point. For example, one report that I heard said that some hardware was included in the $75,000. That information sh
by nopal 16y ago
I agree that it shouldn't be the sole data point.
For example, one report that I heard said that some hardware was included in the $75,000. That information should be released alongside the code.
As you mention, there are lots of reasons that cause a project to go longer than necessary and become overly expensive.
I think there should be some sort of standard for reporting on these types of projects. A report was compiled at various points during a project could be very useful. I could see such a report including a status update from a project manager, costs to date, costs estimated to be remaining, code produced and impediments. (along with whatever I haven't thought of)
I think we, as technical people, should be pushing for this type of openness, although I'm not sure how to begin.