3 ms·
Was the funding for the pedestrian bridge rolled into the funding for the road bridge? That's happening near here, the federal funding for a bridge project mean
by maxerickson 9y ago
Was the funding for the pedestrian bridge rolled into the funding for the road bridge? That's happening near here, the federal funding for a bridge project means that there will be a pedestrian accommodation, even though there's no direct connection on either side of the bridge.
In any case, unless funding is secured all at once, it's likely to be the case that there are bridges that don't connect anything and sidewalks and trails that end abruptly. But both represent movement towards a complete path.
- post_break 9y agoNo, the bridge was built like a decade or two before the pedestrian addition.