10 ms·
Keep in mind those two solutions are on opposite sides of the world. I found this [1], which gives the projected Snowy Mountain 2.0 proposal in Australia at $25
by jgibson 9y ago
Keep in mind those two solutions are on opposite sides of the world. I found this [1], which gives the projected Snowy Mountain 2.0 proposal in Australia at $250/kWh (AUD, presumably).
Regardless, I don't disagree that pumped hydro can still a viable choice in some places when it comes to large scale, I think South Australia made the best choice going with battery storage, even if driven from mostly political reasons.
The SA govt needed to show the federal govt they were capable of holding their own on their renewable policy, against the federal line of the Snowy Mountain 2.0 pumped hydro. Having something up and going in ~100 days with very few unknown factors (pour concrete, install batteries, hook up to grid), opposed to waiting 5-10 years for a solution from the federal government that hasn't even finished a feasibility study yet, and has so much more risk (geological survey, environmental survey, new transmission lines [0] etc)
The other advantage of battery storage I see is that it is immensely flexible for a rapidly changing market. Underprovision? Just buy more. Overprovision? Truck them somewhere else, lease them to a business with peaky loads, plenty of other options.
[0] http://www.illawarramercury.com.au/story/4681519/snowy-hydro-20-could-cost-double-initial-2b-estimate/?cs=7 http://www.illawarramercury.com.au/story/4681519/snowy-hydro...
[1] https://bravenewclimate.com/2010/04/05/pumped-hydro-system-cost/ https://bravenewclimate.com/2010/04/05/pumped-hydro-system-c...