4 ms·
Fuel sourcing and disposal is a small part of the cost. Edit: a projected cost breakdown for Hinkley Point C! https://www.nao.org.uk/wp-content/uploads/2017/06
by pjc50 9y ago
Fuel sourcing and disposal is a small part of the cost.
Edit: a projected cost breakdown for Hinkley Point C! https://www.nao.org.uk/wp-content/uploads/2017/06/Hinkley-Point-C.pdf https://www.nao.org.uk/wp-content/uploads/2017/06/Hinkley-Po... (figure 2)
So fuel is not inconsiderable; 6.2bn "fuel costs", 1.8 "fuel management", 2.6 "fuel disposal". From a total of £54.8 bn.
Add 10-50% to actual construction and decommissioning costs for overruns.