4 ms·
Molten salt reactors require an on-site chemical plant that operates on radioactive salt. Radioactive chemical plants are a pain. Lots of people, lots of plumb
by Animats 9y ago
Molten salt reactors require an on-site chemical plant that operates on radioactive salt. Radioactive chemical plants are a pain. Lots of people, lots of plumbing, highly reactive and corrosive materials, risks of leaks. The history of nuclear fuel reprocessing plants isn't good. Most of them are now Superfund toxic waste sites.
The good thing about PWR and BWR reactors is that the radioactive portion of the system is mechanically simple. All the complexity is outside. The working fluid is water, which is easy to handle and, other than the production of tritium, doesn't become radioactive.
Every reactor design which had complicated stuff happening in the radioactive portion of the system has been a commercial failure.
- DennisP 9y agoLFTRs require on on-site chemical plants but that's not the case for some of the MSRs fueled by uranium.
- philipkglass 9y agoVery true, though fuels that start as water-soluble halide salts should theoretically produce somewhat less complicated flowsheets. You have elegantly summarized why adding a fuel reprocessing step to commercial BWR/PWR fleets makes the systemic costs of nuclear power higher and the waste problems worse. EDIT: oh, uranium and thorium halides hydrolyze except at very low pH. And so will a number of fission-product-halides. So maybe not simpler to start with halide salts instead of oxide fuels.
- mjevans 9y agoAm I correct in understanding that "waste reduction" (breeder) reactors essentially burn more (most?) the fuel in the core, without that external re-processing?
- philipkglass 9y agoBreeder reactors still require a chemical re-processing step to separate fission products (the lighter atoms produced when heavy actinides like uranium split and release energy) from the fuel. There are two main theoretical advantages for breeder reactors. One advantage is that the total energy extractable from terrestrial mineral resources is much greater with dedicated breeder reactors than with reliance on naturally fissile U-235 in simpler non-breeding reactors. In practice, nuclear power production has not grown fast enough to cause uranium shortages. Until there is a significant uranium shortage, reflected in much higher prices for freshly mined uranium, the higher complexity/cost of a breeder reactor cannot be offset by cost savings on fresh uranium fuel. The other theoretical advantage is a reduction in actinide waste production (plutonium, americium, curium). These heavy waste atoms dominate the radioactivity of spent nuclear fuel in the medium term, thousands to tens of thousands of years from now. But in the short term (years, decades, and centuries), the radioactivity of spent nuclear fuel is dominated by fission products rather than actinides. Breeder reactors do not notable reduce production of fission products compared to conventional reactors. Further, the reprocessing of nuclear fuel to separate the fission products has a tendency to turn potent but small, easily-handled waste problems into less potent but much larger and more unwieldy waste problems. Even though there are some theoretical waste advantages to reprocessing fuel instead of using it once and sealing it up forever, in practice waste reprocessing has always led to higher expenses and more radionuclides actually released into the wider environment.
- nickik 9y agoIt does not need to be on-site. In a liquid fuel reactor one could do batch processing. Some startups actually propose to produce reactors with the fuel inside and then recycle the hole reactor. Chemical plants might be a pain but its far easier then doing isotopic separation.