3 ms·
Interestingly or apropos, BART are looking into a second Transbay tube to fix the Transbay tube bottle neck (headway during peak times is like one minute and th
by mc32 9y ago
Interestingly or apropos, BART are looking into a second Transbay tube to fix the Transbay tube bottle neck (headway during peak times is like one minute and they can't add more cars to the trains).
If cheap enough they could bore a second one from SF to the East Bay and an additional from the Peninsula to the Fremont area. to east-west commutes in the south bay.
Pure fantasy would be to have direct point to point routes consisting of the SF-Oakland-SJ triangle with outward spurs from the respective terminuses.