3 ms·
Man, I wish that was the case in London. The central/victoria lines runs at 36tph (less than 2 mins wait between trains) but they are crush loaded full between
by martinald 9y ago
Man, I wish that was the case in London. The central/victoria lines runs at 36tph (less than 2 mins wait between trains) but they are crush loaded full between 7am and 9am. Luckily we have crossrail coming to relieve the central line, which took less than 10 years to build in its entirety. Unlike the 2nd Av Subway which seems to be taking about 30 years (ignoring the failed start in the 70s).