2 ms·
1.x was rough every point release broke major stuff 2.x was stable all through, but a lot of work to migrate from 1.x 3.x minor changes but a big renaming eff
by dep_b 9y ago
1.x was rough every point release broke major stuff
2.x was stable all through, but a lot of work to migrate from 1.x
3.x minor changes but a big renaming effort leading to a lot of work in accepting proposed changes in Xcode. Laborious more than difficult
4.x most projects I've tested just compile. On the road to a stable ABI