3 ms·
That was with all costs included and no subsidies. With subsidies it was about $1-2/kW. That was 5kW before derating.
by throwaway5752 9y ago
That was with all costs included and no subsidies. With subsidies it was about $1-2/kW. That was 5kW before derating.
- kurthr 9y agoWow! Sounds like a good deal. You could do it for components without installation costs, but even utilities can barely get that today in California on 100MW builds.