3 ms·
Not really - ITER alone is expected to be in excess of $20 billion, that would buy you about 20 modern HVDC Transmission lines, each with a length of 1000 km an
by sandl 9y ago
Not really - ITER alone is expected to be in excess of $20 billion, that would buy you about 20 modern HVDC Transmission lines, each with a length of 1000 km and able to transmit 40 GW of power in total. That's a lot of power. :-)
http://electrical-engineering-portal.com/analysing-the-costs-of-high-voltage-direct-current-hvdc-transmission http://electrical-engineering-portal.com/analysing-the-costs...