3 ms·
The general strategy would be a) introduce less heat and b) extract more. The first might be accomplished through greater efficiencies, though that's limited.
by dredmorbius 9y ago
The general strategy would be a) introduce less heat and b) extract more. The first might be accomplished through greater efficiencies, though that's limited.
If a major heat component is braking, then locating the additional cooling capacity where breaking is heaviest (presumably on inbound station approaches) might offer advantages -- at the very least this reduces the total treated area for maximum effect.
Given the possiblity of ground-based thermal banking, and the long-term nature of the issue, if any amount of coolant could be circulated through the thermally-affected clay, and made available for seasonal heating needs elsewhere in the city, that might be a net win.
I'm familiar with geothermal energy projects elsewhere (borehole projects in Australia, the Habernero project) where the problem is actually inverted: themal extraction cools the strata around a borehole, over the course of about 40-50 years, to the point that no further useful heat can be extracted.
The thought also occurs that the steel rails themselves are thermally conductive and might be made a part of the cooling system. Not a tremendous radiative surface, but a long conductive length. Poorly placed, that is, low within the tunnel, rather than high, for effective heat extraction though.