3 ms·
Additional bridges not only increase the cost of the interchange, but also its size. To allow for a 5 m vertical clearance for the bridge, you will also need ap
by oozcitak 16y ago
Additional bridges not only increase the cost of the interchange, but also its size. To allow for a 5 m vertical clearance for the bridge, you will also need approach and exit ramps. If your maximum allowed design slope is 5%, you will need 100 m ramps at each side of the bridge, increasing the size of the interchange by 200 m.