Ask HN: Is there academic research on the effectiveness of estimation in scrum?
It would be especially interesting to see results about improvement of accuracy over time.
- shubb 9y agoThere is very little accademic research on Scrum. This person has done some stuff on some aspects: https://collaboration.csc.ncsu.edu/laurie/publicationsAll.html#Agile https://collaboration.csc.ncsu.edu/laurie/publicationsAll.ht...
- UK-AL 9y agoIt's generally hard to do academic research on these sorts of things. Since you need multiple teams, building similar software in order to compare.
- blcArmadillo 9y agoNot specific to scrum but I am reminded of a part from Peopleware: "The most surprising part of the 1985 Jeffery-Lawrence study appeared at the very end, when they investigated the productivity of 24 projects for which no estimates were prepared at all. These projects far outperformed all the others (see Table 5-3)." Table 5-3 Productivity by Estimation Approach (Full Result) ----------------------------------------------------------------------- Effort Estimate Prepared by Average Productivity Number of Projects ----------------------------------------------------------------------- Programmer alone 8.0 19 Supervisor alone 6.6 23 Promgrammer & supervisor 7.8 16 System analyst 9.5 21 (no estimate) 12.0 24 Source: https://www.amazon.com/Peopleware-Productive-Projects-Teams-Second/dp/0932633439 https://www.amazon.com/Peopleware-Productive-Projects-Teams-...
- usgroup 9y agoThis doesn't surprise me tbh. It's the same situation except you're not shackled by yesterday's commitments and free to act independently of them .
- AnimalMuppet 9y agoNot scrum-specific, and I don't recall whether it was backed by academic research, but one of the rules in XP is that estimates longer than 3 weeks were (more) unreliable. So if the estimate was longer than 3 weeks, you had to break it up into chunks, each of which was 3 weeks or smaller.
- elviejo 9y agoThere is no correlation between time duration and task estimation. https://www.iancarroll.com/2016/04/18/no-correlation-between-estimated-size-and-actual-time-taken/ https://www.iancarroll.com/2016/04/18/no-correlation-between...