Ha Ha! Welcome to the world of Starchitects. For a building like the Walkie Talkie, Vinõly would have been personally involved only at the very beginning. The q
by willyt 9y ago
Ha Ha! Welcome to the world of Starchitects. For a building like the Walkie Talkie, Vinõly would have been personally involved only at the very beginning. The question of who is actually responsible for removing the mitigation measures from the 'Walkie Talkie' is likely to be very complicated, depending on the procurement route taken by the client. It is quite likely that a 'Design Build' contract was used for the Walkie Talkie, where the concept architect hands over the design to a construction firm who then employs a completely separate team of architects and engineers to do the detailed construction design. The building is documented in the 'employers requirements' by the concept architects and then this package of information is handed over the contractor to fill out the details. I don't know how Vinõly works, but its possible his firm hands over the employers requirements quite early in the process and the problem solved by the fins wasn't clearly communicated to the design build contractor who then removed them to save money once Vinõly was no longer involved. This would explain why he was so blasé about the known problem with the concave design.
http://www.pannone.com/media-centre/articles/construction-articles/walkie-talkie-shedding-light-construction-procurement http://www.pannone.com/media-centre/articles/construction-ar...
- emmelaich 9y ago> The question of who is actually responsible for removing the mitigation measures Same as the design phase. It is guaranteed that engineers would have foreseen and been able to calculate the heat intensity. They just didn't have enough influence or ownership of the problem.
- poooogles 9y ago>Same as the design phase. It is guaranteed that engineers would have foreseen and been able to calculate the heat intensity. Not the case. For the walkie talkie it was evaluated and the design (including location and it's orientation) were passed by a consultancy for a bunch of environmental items. Seemingly that wasn't the case and they spent £13m retrofitting shutters. AFAIK the main contractor went after the consultancy for the money but I can't for the life of me find any references right now.