3 ms·
Trump wants new aircraft carriers returned to 'Goddamned steam' power catapults
- valuearb 10y agoFirst he was right about Andrew Jackson, now he's right about carrier catapults? What the heck is going on? On May 1, 1833, Jackson wrote, "the tariff was only the pretext, and disunion and southern confederacy the real object. The next pretext will be the negro, or slavery question" And electronic catapults have failed all testing and aren't remotely ready for actual service.
- taxicabjesus 10y agoThe article offers context for the quote towards the end: But some experts say Trump’s comments, already being widely mocked among defense types, aren’t without merits, lauding in particular his push to name-and-shame vast defense cost overruns on systems like EMALS. “The president’s critique of the program is correct. He’s right to be frustrated and he’s right to step in and tell the Navy to pay greater attention to these overruns,” said Jerry Hendrix, a navy expert at the Center for a New American Security. The price tag for the three Ford-class aircraft carriers ballooned from $27 billion to $36 billion in the past decade, and the project is behind schedule in part because of the EMALS system, as the Atlantic reported. Sen. John McCain (R-Ariz.), chair of the Senate Armed Services Committee, slammed the carrier project as “one of the most spectacular acquisition debacles in recent memory” in 2015.
- zkms 10y agoI get that there've been cost problems and implementation issues with bringing EMALS into full readiness, but that's not a reason to kill electromagnetic aircraft launch altogether. Electromagnetic aircraft launch has significant legitimate technical advantages over steam: not needing high pressure steam piping, being able to precisely meter the acceleration profile (to reduce stress on airframes), not having "cold cat" issues, and being able to deploy it (or downsized versions of it) on vessels that do not have ample steam / desalinated water supplies. Subcontracting out components of a complex system makes sense after it's has been properly designed and tested in the field and all the hard-learned lessons have been internalised. Applying this methodology to creating the first instance of a system that has never been fielded before is not likely to work so well. Expecting the semi-incestuous menagerie of {General Atomics, Alion Science and Technology, Kato Engineering, L3, QinetiQ, STV, Inc., Curtiss-Wright, ESCO, ITT} to create a deployment-ready EMALS with no fielded precedents was a huge mistake. Taking a complex, never-built-before weapons system and putting it in production while it's still in testing is folly, having its development overseen by a literal clusterfuck of subcontractors doubly so.
- valuearb 10y agoElectronic catapults need to operate for months at a time without problems, so far they can't even do days.