2 ms·
^ I agree with this. My main point is that LoC is always a bad metric. Scrum points can be a bad metric if misused for purposes other than estimating the effo
by tedmiston 10y ago
^ I agree with this. My main point is that LoC is always a bad metric. Scrum points can be a bad metric if misused for purposes other than estimating the effort required to solve a given problem.