3 ms·
There's also been specific allegations that BP's cementing specifications to Haliburton were supar to (we assume) cut costs. E.g. use 4 of X instead of the rec
by hga 16y ago
There's also been specific allegations that BP's cementing specifications to Haliburton were supar to (we assume) cut costs. E.g. use 4 of X instead of the recommended 20 and that sort of thing.
BP were the architects/designers of the whole affair as well as the entity that made the high level operational decisions like when and how to replace the mud with seawater.