Not only the drilling, but the shoring up and walling of the tunnel. Also, people tend to be opposed to "move fast and break things" if they're likely to get bu
by pjc50 10y ago
Not only the drilling, but the shoring up and walling of the tunnel. Also, people tend to be opposed to "move fast and break things" if they're likely to get buried under them.
- ethbro 10y agoUntil you remove the "they" by fully automating the system.
- gpm 10y agoPeople also tend to object to "move fast and break things" when they, and their very expensive buildings, are on top of said things and get broken as a result.
- ethbro 10y agoPoint. Although I'd assume the majority of subway routes tend to be built under roads (also bad, but less terrible)? Not sure what the geology of San Francisco / California tends to be like, but I believe most of the Manhattan skyscrapers are anchored down to the bedrock. Which I'd expect would require cutting and reinforcing vs just "drill on through".
- pjc50 10y agoUltimately you want to put passengers in the tunnel, yes?
- ethbro 10y agoFrom parent comment, I was guessing that the point of greatest risk would be during tunneling / initial bracing? Rather than final static bracing.
- pjc50 10y agoI was thinking of the NATM failures: http://www.tunneltalk.com/images/laneCoveCollapse/Ref5-Heathrow-failures-highlight-NATM-misunderstandings-Shani-Wallis.pdf http://www.tunneltalk.com/images/laneCoveCollapse/Ref5-Heath... (which were during construction, but happened in "finished" sections, I believe. NATM applies a single pass of shotcrete to the cut rock surface)