2 ms·
From the source: In preparation for the next operation phase (OP 1.2a), which is scheduled to start in late summer of this year, the limiter structures have be
by clon 9y ago
From the source:
In preparation for the next operation phase (OP 1.2a), which is scheduled to start in late summer
of this year, the limiter structures have been replaced by a test divertor and all graphite tiles on the
baffles and wall protection elements have been installed. This will allow the use of more heating
power and access to the required magnetic field configurations.