3 ms·
PATH is at peak ridership. In 2010 it had a signals upgrade so that train spacing could be reduced, allowing more trains/hour at peak. The single tunnel shared
by greglindahl 10y ago
PATH is at peak ridership. In 2010 it had a signals upgrade so that train spacing could be reduced, allowing more trains/hour at peak.
The single tunnel shared by Amtrak and NJ Transit trains is 100% full of trains which are over 100% full at peak.
So yes, PATH and other trains are extremely useful.