4 ms·
Now you understand a tiny part of the Energy business. 'Nuclear' is not only a technical problem, it is a financial problem. Old plants will be run until they c
by lispm 10y ago
Now you understand a tiny part of the Energy business. 'Nuclear' is not only a technical problem, it is a financial problem. Old plants will be run until they collapse - unless a regulator keeps the companies from doing that. But then the regulator comes onto pressure, because there is huge amount of money/corruption involved to keep the plant online. Every single plant is a multi-billion dollar investment, jobs, surrounding industry, ...
Tepco from Fukushima claimed until the day their plants were hit, that everything was totally safe. Politics supported them. Nobody was questioning them.
- mpweiher 10y agoYes, and despite the technical failings, the political failings and the corruption, the effects were comparatively benign.
- sfifs 10y agoPossibly to you sitting on the other side of the world. Not so for the thousands of people displaced who lost their homes and communities through no fault of their own and might be exposed to higher cancer rates in their lifetimes.
- mpweiher 10y agoYes, the evacuation zone almost certainly should have been smaller, that's one of the perverse effects of the panic about nuclear, that the mitigation efforts tend to be overblown (not that they should be zero), and therefore the damage from the mitigation much worse than it needs to be. But you missed the word "comparatively". We have lots of human-/technology-induced deaths and injuries. We allow car traffic in our cities at speeds that kills and maims thousands, often children. These are completely avoidable, just lower speed limits to 5mph or less. The US allows more than ten thousand gun deaths every year, because "reasons". etc. etc. So yes, the effects were comparatively benign, compared to most of the technology we surround ourselves with, and certainly compared to all power-generating technologies we have (including solar). Not absolutely benign, though it would be interesting to compare the damage even of accidents like Fukushima to the benefits (in lives saved) of the electricity that was produced.
- petre 10y agoThere are people who have returned to their old residences inside the Chernobyl danger zone and they're doing just fine.
- lispm 10y agoRight, it will cost only a few hundred billion dollars, maybe a trillion, to clean up the effects from the earthquake on the nuclear power plants. The country lost most of their nuclear power plants in a single day. It takes years, if not decades to bring them back online - partly. 50 plants. Each worth, say, ten billion dollar (current worth and future earnings - just an estimate). That loss alone goes into the hundreds of billions. Additionally fuel had to be imported, other plants had to be built. 'Currently 42 reactors are operable and potentially able to restart, and 24 of these are in the process of restart approvals. The first two restarted in August and October 2015.' Six years after the earthquake/tsunami. Only a few ten thousand people, maybe a hundred thousand, will work in Fukushima under extreme circumstances to keep the site stable and clean it up the site for the next five decades. Robots die regularly after a short time inside the reactors. Humans get a year worth radioactive exposure in a few hours. Where to get all the people needed to work there? We have experience to dismantle functioning reactors. Here we have damaged reactors with damaged fuel... Very little effects... I don't think so. The effects were much more severe than the industry thought. They were thinking that most of the reactors would operate again, by now. World-wide reactor projects were seeing delays. Companies have a hard time to survive. All these are effects of a single earthquake/tsunami on the nuclear reactor industry. It's a huge financial catastrophe for the nuclear industry and the countries financing it.
- mpweiher 10y agoRight, what you describe are largely the effects of the overreaction, as I was describing elsewhere. There was no actual need to shut down the other plants, etc.
- lispm 10y ago> There was no actual need to shut down the other plants, etc That's your personal opinion. I think it's naive, because you had actually no idea in what state the other reactors were. The OFFICIAL REGULATION AUTHORITIES for nuclear safety in Japan had a different opinion. Some plants had damages, were shutdown because of the earthquake, every plant needed inspections and every plant needed full safety reviews. That it takes so long to bring some of the reactors back shows that there are lots of doubts about their safety and the industry will need to do more than just say 'there was no need to shut them down' - nobody believes that. Here you can find a good overview what the authorities are doing and when reactors might be restarted - if at all: http://www.world-nuclear.org/information-library/country-profiles/countries-g-n/japan-nuclear-power.aspx http://www.world-nuclear.org/information-library/country-pro... Japan sits on a seismic very active region and severe earthquakes and tsunamis happen. It's only logical after such damage to question the whole safety architecture. Are the spend fuel pools in similar unfortunate positions? Are they full, too? What happens at complete loss of outside electricity? Are the reactors able to safely shutdown then, unlike Fukushima? Can the spent fuel pools be cooled? Are there instruments in the reactor able to survive massive damage in an earth quake? There are many many questions which have not been asked for a decade, because the consequences would have been costly upgrades and even the shutdown of reactors - for example those sitting near fault lines. Given that the nuclear industry in Japan is corrupt and runs very old reactors with severe design mistakes, I think it is only justified to shut down the industry for a full review. That would also include the whole network of politicians, research, industry, utilities, ...
- danmaz74 10y agoThe OP was talking specifically about closing existing plants before they reach their "end of life" date though.
- lispm 10y agoFukushima Daiichi 1 just go a ten year life extension in feb 2011. A few days later it was a multi-billion-dollar wreck. Not at 'end of life' obviously does not mean 'safe to operate'. 'end of life' is also not a fixed date. Once the initial 'end of life' date comes, the owner will see how to get a life extension. Fukushima Daiichi 1 had an inspection, some upgrades, got the life extension. Following month this was one of most costly decisions ever made in industry.