You keep blaming the military for the Shuttle, but to justify the Shuttle NASA forced the air force to cancel its own space program to fly on the Shuttle, so NA
by valuearb 10y ago
You keep blaming the military for the Shuttle, but to justify the Shuttle NASA forced the air force to cancel its own space program to fly on the Shuttle, so NASA forced itself to modify the Shuttle to meet Airfirce requirements.
And your confidence in their big project budgeting i misplaced. The air force didn't force them to miss their 50 flight a year commitment, they greatly underestimated refurb times/costs for the engines, orbiter and SSRbs. They rstinated $15M a flight and actually cost $1.5B a flight.
NASAs own estimates are over $750M a flight over first decade with development (pad costs are dev costs). But they don't even have missions for all those flights, it's extremely unlikely they'll do 4 a year or control their costs when congress is involved.
"During the joint Senate-NASA presentation in September 2011, it was stated that the SLS program had a projected development cost of $18 billion through 2017, with $10 billion for the SLS rocket, $6 billion for the Orion Multi-Purpose Crew Vehicle and $2 billion for upgrades to the launch pad and other facilities at Kennedy Space Center.[12] These costs and schedule were considered optimistic in an independent 2011 cost assessment report by Booz Allen Hamilton for NASA.[79] An unofficial 2011 NASA document estimated the cost of the program through 2025 to total at least $41bn for four 70 t launches (1 unmanned, 3 manned),[2][3] with the 130 t version ready no earlier than 2030.[80]
The Human Exploration Framework Team (HEFT) estimated unit costs for Block 0 at $1.6bn and Block 1 at $1.86bn in 2010.[81] However, since these estimates were made the Block 0 SLS vehicle was dropped in late 2011, and the design was not completed.[82] The Space Review estimated the cost per launch at $5 billion, depending on the rate of launches."
And nothing about the SLS is reusable or hard to duplicate except the blank check they s paying for it. Its reliance on SRBs is low tech, and risky on a manned rated vehicle. It's a far less impressive launch vehicle than the SaturnV.
Raptor is already in testing. The BE-4 is on the way. The Russians built Energia. If NASA bid out its heavy launch capability they'd cut their heavy launch costs by at least 70%.