Well the Caltrain electrification is in one of the book ends. The logic for starting in the middle is that it created economic assistance (as a side effect) in
by gumby 10y ago
Well the Caltrain electrification is in one of the book ends.
The logic for starting in the middle is that it created economic assistance (as a side effect) in an area with a jobs problem. Why not start that part sooner rather than later?
- jedberg 10y agoBecause no one will ride that section. If you start on the ends people will actually pay money to ride the train, which then funds construction on the other part of the train and provides steady jobs instead of only temporary ones. If you want to provide welfare to people without jobs, then provide welfare. Don't provide secret welfare and call it a high speed train.
- ZanyProgrammer 10y agoPolitically it would've helped the project much more to have had tangible success in the economic heart of CA, impacting shitloads of people (and voters).
- dragonwriter 10y ago> If you start on the ends people will actually pay money to ride the train The initial operating segment runs through the Valley to San Jose; that's pretty close to the S.F. end , and is the third biggest city in California (and the second biggest covered by the whole Phase 1 LA-to-SF alignment.) Obviously, the initial operating segment isn't going to connect both ends, and short of doing that, where specifically would be better than the actual planned IOS? Sure, the initial construction segment is a small section in the valley that would probably see little ridership without being connected to some place nearer to the endpoints, but the ICS is not the whole IOS.
- ZanyProgrammer 10y agoHave they even started on Pacheco yet? All this talk about San Jose to the navel of the world in the CV is hot air without it.
- jedberg 10y agoThe initial plan was to go from Stockton to Fresno. They only extended it to San Jose when people complained about how useless that would be.
- dragonwriter 10y ago> The initial plan was to go from Stockton to Fresno. No, the initial plan was Burbank to Merced. Not that the initial (or any intermediate) plan is even germane to the discussion.
- JamilD 10y agoExactly -- the HSR Authority is investing heavily in upgrades to Caltrain and Metrolink; they provide tangible benefits to commuters in the cities while building the infrastructure they need to run the high-speed trains in the cities. They can't get the high-speed trains running between SF and SJ until electrification and upgrades to the corridor are finished. And at the same time, they're doing construction in the Central Valley, which is cheaper and easier on a per-mile basis. Just wish they could find a way to do it faster though; 7 years for SJ-Bakersfield seems like an unreasonably long time.
- ZanyProgrammer 10y agoWhich upgrades to Caltrain? CBOSS? San Bruno grade sep? You really want to defend those?
- JumpCrisscross 10y ago> it created economic assistance (as a side effect) Let's be honest, it was an important if not dominant reason for this project.
- dragonwriter 10y agoThe initial operating segment was always going to be near one of the Phase 1 endpoints (LA/SF) to somewhere in the middle (nothing else that doesn't require the whole north/south alignment to be built before running any trains makes sense.) It's true that building the smaller initial construction segment in the Valley was driven by economic development concerns, but the Valley needed to be part of any sensible initial operating segment anyway, so why not start building their if the side benefits were greatest there?
- ZanyProgrammer 10y agoBecause they are temp jobs and no one will ride those tracks for years?
- rocqua 10y ago> The logic for starting in the middle is that it created economic assistance (as a side effect) in an area with a jobs problem. Why not start that part sooner rather than later? This is much like the broken-window-fallacy. The reason not to start in the middle is because the middle (especially on its own) doesn't have a lot of inherent value. Heck, if the train here (minus wages) costs more than it is worth this is a straight-up broken-window-fallacy.
- hueving 10y ago>Heck, if the train here (minus wages) costs more than it is worth this is a straight-up broken-window-fallacy. Not really. Lots of projects can start out in the red and then provide more value longer-term. This is particularly true when talking about improving transit to impoverished areas.
- ubernostrum 10y agoCongratulations! You've proved you can type the phrase "broken-window fallacy". Just be careful -- if you do it three times in a single comment, a ghost will appear in your bathroom mirror. Meanwhile... if you're going to build a high-speed line from SF to LA, why not start the project by 1. In locations which already have rail infrastructure, upgrading that infrastructure to the required standard, and 2. In locations which lack existing infrastructure or connections to the planned stops of the line, get the construction on that going And if as a side effect it boosts the economies of the places in (2), well, that's a nice side effect. But "we were going to do this anyway, doing it in this order gets this side effect that's useful" is not the broken-window fallacy. Plus, you know, infrastructure isn't generally built for its high profit margins; it's built because of the profit it generates in other sectors.