3 ms·
If it was a company that does a lot of contracting, then doing the minimum (to spec) is pretty much required. Do anything more than what the customer asked for
by moftz 10y ago
If it was a company that does a lot of contracting, then doing the minimum (to spec) is pretty much required. Do anything more than what the customer asked for and you are wasting resources.