4 ms·
The emergency spillway operated for a day at 5% of design flow, and that minor flow caused enough erosion to threaten to undermine and collapse the spillway str
by marze 10y ago
The emergency spillway operated for a day at 5% of design flow, and that minor flow caused enough erosion to threaten to undermine and collapse the spillway structure.
Higher flows, like 100x higher, would have cut a deep channel where the emergency spillway was.