4 ms·
The bedrock that the actual dam is built on is "hard amphibole" https://kb.osu.edu/dspace/bitstream/handle/1811/58502/SES-SeniorThesis_AndersonDennisM_1976_tex
by gonzo 10y ago
The bedrock that the actual dam is built on is "hard amphibole"
https://kb.osu.edu/dspace/bitstream/handle/1811/58502/SES-SeniorThesis_AndersonDennisM_1976_text.pdf?sequence=4 https://kb.osu.edu/dspace/bitstream/handle/1811/58502/SES-Se...
This material will erode, but not so quickly that the main body of the lake wouldn't be shut off.
The "30 foot" figure is the depth of the water above this bedrock. Had the emergency spillway failed, this is what would have been released without any controls.
The main spillway was built on alluvium. I've posted elsewhere in the comment thread that cavitation was the primary cause of the concrete erosion.
- marze 10y agoThe emergency spillway operated for a day at 5% of design flow, and that minor flow caused enough erosion to threaten to undermine and collapse the spillway structure. Higher flows, like 100x higher, would have cut a deep channel where the emergency spillway was.
- deleted 10y ago[deleted]
- deleted 10y ago[deleted]