3 ms·
The limiting factor on rail networks is the time it takes switches to reset. The London Underground has a scheduled headway of 60 seconds on its busiest line, W
by jcranmer 10y ago
The limiting factor on rail networks is the time it takes switches to reset. The London Underground has a scheduled headway of 60 seconds on its busiest line, WMATA 90. (They can switch faster, but if there's a breakdown, it's useful to have extra slack in the schedule so you can recover). Cable cars don't need to switch, but Hyperloop does. At the speeds of Hyperloop, the minimum allowable distance between two cars is another factor.