5 ms·
That sounds like a great idea. I've actually debated doing this before, but I wasn't sure if the service disruption was worth it considering it happens maybe o
by chrishacken 10y ago
That sounds like a great idea. I've actually debated doing this before, but I wasn't sure if the service disruption was worth it considering it happens maybe once every other month and sporadically at that.
- nickpsecurity 10y agoYou could make the maintenance once a month on days your monitoring shows already have about no traffic. If a HA setup, then fail-over, reboot main, fail-back-over, reboot other stuff. Minimal disruption there.
- patrickg_zill 10y agoThe last level3 contract I had had such a maintenance window declared in it. So I can't claim credit for it :)
- m3talsmith 10y agoI ran a bootstrapped ISP much the same way. I ran into the static issue as well did a few things to fix it. Ran a better ground on the roof. Isolated the tower from the roof surface with wood (that was done during tower erection). Lastly, I put a fiber link cut in-between the run of Ethernet from the data center, and the router box on the tower.
- dsl 10y agoI did a bunch of ISP builds in my younger days. It is worth while to see if you can horse trade some internet for an electrician with tower experience (or a real RF engineer) to help you. As other commenters have suggested, check your ground potential and make corrections as necessary.
- chrishacken 10y agoUnless I open up the device, there's nothing to attach ground wire to. The device is constructed primarily of plastic. Grounding the dish wouldn't do anything, would it?
- benjamincburns 10y agoI think you want to be grounding the shield on your Coax line. But I'm not an electrician or an RF engineer, so I might be completely wrong.